Power-First Hyperscale Infrastructure

Power Built
On-Site.
Not Waiting
In Queue.

MSB Global Services is building the Matrix AI Campus — a 3 GW, four-phase hyperscale development in Sulphur Springs, Texas. Behind-the-meter generation on day one. No ERCOT interconnection queue. No grid dependency.

3 GW
Planned Capacity
30
100 MW Buildings
4
Development Phases
BTM Power Strategy
On-site power generation that avoids ERCOT's transmission interconnection queue — the constraint currently delaying grid-tied data center development across Texas.

Infrastructure companies
don't wait for the grid.

Texas' interconnection queue is backed up by years. Grid-tied development means waiting — for capacity, for approval, for infrastructure that may never arrive. MSB's answer is behind-the-meter generation: on-site solar and microgrid architecture that powers the campus independently from day one.

01
Behind-the-Meter Generation
On-site utility-scale solar generation built into the campus from day one. Power generation is campus infrastructure, not a supply chain dependency.
02
Campus-Level Microgrid
Distributed microgrid electrical architecture gives each building direct access to generation capacity. N+1 redundancy designed into the topology from the start.
03
No Interconnection Queue
ERCOT's transmission interconnection process is the primary bottleneck for grid-tied data center development in Texas. MSB's BTM strategy bypasses it entirely.
04
AI-Grade Cooling
Designed for direct-to-chip liquid cooling and immersion systems, engineered for the thermal density requirements of AI-scale GPU workloads.
Power infrastructure under construction at Matrix AI Campus
"Power built on-site — not waiting in Texas' interconnection queue."
Matrix AI Campus — Sulphur Springs, Texas

Campus-scale.
Phase-planned.
Shovel-ready.

The Matrix AI Campus in Sulphur Springs, Texas is a four-phase, master-planned hyperscale development. Thirty individual 100 MW buildings. Site and utility infrastructure work began in early 2025. Groundbreaking held June 2025.

3 GW
Planned Build-Out
30
Buildings × 100 MW
4
Phases
35%
Tax Abatement
Matrix AI Campus construction — excavators in formation
Under Development
Sulphur Springs, Texas — Hopkins County
Matrix AI Campus groundbreaking ceremony June 2025
Groundbreaking held June 2025. A public-private partnership with the City of Sulphur Springs and Hopkins County.
Matrix AI Campus Groundbreaking — June 2025

One operator.
Land to lights-on.

Build-to-Suit
From acquisition through energization, MSB is your single operator. We don't make you fit our model — we build a better model around you.
Colocation at Scale
Campus-scale colocation for hyperscale AI operators who need dedicated, large-block capacity without a bespoke development program.
Power Infrastructure
Campus-level microgrid, N+1 redundancy, BTM generation built in. Power is not a procurement problem — it is part of what we deliver.
AI-Grade Cooling
Direct-to-chip liquid and immersion cooling designed for AI-scale GPU thermal density. Engineered from day one, not retrofitted later.
Sustainability Programs
Active programs in water use reduction, power efficiency, low-carbon materials, biodiversity preservation, and carbon accounting.
Public-Private Partnership
35% tax abatement through partnership with the City of Sulphur Springs and Hopkins County — government-backed site infrastructure support.

Sulphur Springs,
Texas.

Hopkins County, East Texas. Matrix Business Reserve — a master-planned development site with government infrastructure partnership, tax abatement, and existing utility relationships.

Site Name
Matrix Business Reserve
County
Hopkins County, Texas
Partnership
City of Sulphur Springs + Hopkins County
Tax Incentive
35% Tax Abatement
Status
Under Development — Groundbreaking June 2025
Matrix AI Campus — Sulphur Springs Texas
MSB

Talk to MSB
Global Services.

Whether you're evaluating campus capacity, exploring build-to-suit programs, or assessing infrastructure investment — reach us directly.